addressS.No. 78/2//1/2/1, gokul nagar near om namah shivay building, warje pune-411058
Pilling Contractor that is by pouring bentonite solution into the pile along with water to wash the bentonite solution at the top. This makes the surface hard in layers, then a suitable chisel is used to drill through these layers for socketing necessities. The chisel that is chosen is based on pile diameter and the capacity to be mobilized. The layering is ended after determining of the penetration of the chisel for the amount of energy utilised. This is completed by pouring bentonite solution to wash the bored hole. The specific gravity for the solution to come out is measured to make sure that the bore is cleansed properly. Following this the reinforcement is brought down following by tremmie and the concreting.